Our Process

From groundbreak to occupancy.

Seven steps. Every scope in parallel. Everything visible in your portal.

01

Planning & Assessment

We review project drawings, assess every utility requirement, and develop one coordinated infrastructure plan across all scopes — before the first application goes out.

In your portal: the full utility plan, scope by scope, from day one.

02

Filings & Applications

We submit every utility application at once — Con Edison, National Grid, DEP, DOT, and the telecom providers — and open the Con Edison service request from day one. Parallel cases are how months come off a schedule.

In your portal: live status on every application and open comment.

03

Engineering & Design

Load letters, fixed sketches, vault and service layouts — we work the utility engineering process alongside your design team, resolving comments and driving each case to an approved design instead of waiting on it.

In your portal: every drawing, submission, and approval as it lands.

04

Permits & Approvals

DOT street opening permits, sidewalk and roadway approvals, and every agency sign-off needed before the ground opens — sequenced so no permit ever becomes the reason a crew stands down.

In your portal: each permit, its status, and its expiration in one view.

05

Relocations & Cutoffs

Existing services are relocated or disconnected before demolition and excavation need the ground — coordinated across every utility, documented, and confirmed off your critical path.

In your portal: confirmation on every cutoff before the schedule depends on it.

06

Construction

Excavation, support of excavation, vault construction, mains, and conduit — we manage subcontractors, schedule field work, and coordinate across all utilities so one trench serves three scopes instead of three trenches on three mobilizations.

In your portal: field progress, photos, and milestone tracking.

07

Energizing & Closeout

Inspections, cable pull, meters, and final activation on every scope — from Con Edison energizing to water service sign-off — closed out with full restoration and a complete documented record.

In your portal: closeout documents and the full project history.

Manhattan skyline panorama
The Difference

Parallel, not sequential.

Most projects run utility scopes one after another because no single party owns them all. We run them at the same time — because we do.